![]() |
Past Projects |
|
|||
|
|
2002- Lake Wateree Baptist Church, Ridgeway, South Carolina. Education Space addition. First Team, started from slab. Tied into existing building. Dried in building, roughed in electrical 2003- Indian Creek Baptist Church, Mineral Wells, Texas. Sanctuary and Office space. Sanctuary capacity 600. Third team. Installed drywall, electrical, insulation, step-down ceiling and cathedral ceiling. 2004- Buena Southern Mission Baptist Church, Buena Vista, Indiana. Sanctuary and education space. Sanctuary capacity 300. Second team, completed roof, installed windows, doors, siding, dry wall, stage and fire wall. |
|
|||